Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

  • A small hole is created around the problem area.
  • The supporting piers are pressed into the ground one by one.
  • The piers are held in place by the patented CarbonLocTM system.
  • The piers are capped by a solid concrete block.
  • A hydraulic jack is added to the block.
  • The jack raises the foundation into the correct position.
  • The jack is repaced by concrete cylinders.
  • The excavated area is filled in when ready.
  • The foundation is now incredibly secure thanks to the patented CarbonLocTM system and Waco Foundation Repair!